Unlimited PTO and accrued PTO usage rates land in the same range. The real difference is who owns the ambiguity — and which failure mode you're better at preventing.
RAID log and risk register aren't the same tool. Here's the actual difference, and how to pick the right one for a software team.
Story points measure complexity, hours measure time — but most teams run both at once with no rule between them. Here's the failure mode, and the fix.
Capacity planning asks if you have enough hours. Resource planning asks who does the work. Confusing them is why plans slip anyway.